Tuas Power Generator
Status: Completed
Replacement, testing and commissioning of 8 sets of "Trane" Raup 500 D1A1B (50 Tons) air-cooled condenser units for CCP 3 & 4 turbine building at Tuas Power Plant.
Building: Turbine Building
Description: Replacement, testing and commissioning of 8 sets of "Trane" Raup 500 D1A1B (50 Tons) air-cooled condenser units for CCP 3 & 4 turbine building at Tuas Power Plant.
